VAMC Louis A. Johnson, Clarksburg, WV, Five-Year Plus Extension (2013-2019) A/E IDIQ VA244-12-R-0326
-
Task Order VA244-13-D-0228, Project #540C35008, Ambulatory Care Support/Physical Security Improvements, $914,000; P00001, Green Globes Commissioning & Additional Design Services, $258,000
-
Task Order VA244-15-J-6391, Project #540-15-110S, Vertical Expansion Analysis, $110,800; P00001; Seismic Soil Study, $13,875
-
Task Order VA244-16-J-4854, Project # 540-16-302, Replace Boiler Deaerator & Condensate Tanks, $174,005
-
Task Order VA245-17-J-0021, Project # 540-16-304, National Electric Code Violation Switchgear Room, $12,024
-
Task Order 36C24518N3364, Project # 540C80166, HVAC Assessment, $49,336
-
Task Order 36C24518N3890, Project # 540-C80187, Design Replacement of Roofs on Bldg. 1 & Clinical Addition, $440,075 (Design Phase Complete), P0001 $7004
VAMC Pittsburgh, PA, Healthcare System-Contract# VA244-13-C-0339, Electrical Breaker Repair/Replacement $104,000, Complete, Prime Contractor
VAMC Wilkes-Barre, PA-$278,000 Arc Flash Study, VA244-P-1816, Complete, Prime Contractor
Department of Energy, National Energy Testing Lab-Subcontractor to Shuck Construction, Teamed with Eaton Corporation; Electrical Equipment Repair, Supply and Upgrade, $100K
Verizon-Subcontractor to Vasoli Electric, Teamed with Eaton Corporation, Electrical Equipment Maintenance and Testing, $300K
Cargill Multisite Electrical Studies-VETs was a subcontractor to Eaton, performed $1M short circuit, coordination and arc-flash analysis studies for 100+ Cargill facilities throughout the USA. Developed time-current coordination curves to determine coordinated settings for protective devices, performed voltage drop analysis, arc flash hazard analysis, and printed and affixed arc flash hazard warning labels.
Walmart Multisite Electrical Studies-VETs was a subcontractor facilities to Eaton; performed $1M short circuit, coordination and arc-flash analysis studies for 100+ Walmart facilities throughout the USA. Developed time-current coordination curves to determine coordinated settings for protective devices, performed voltage drop analysis, arc flash hazard analysis and printed and affixed arc flash hazard warning labels.
VETS Principals
Department of Military and Veterans Affairs, Southeastern Veterans Center, Spring City, PA, $41M Community Living Center and $35M Community Living Center Renovation
University of Pittsburgh Sennott Square, Pittsburgh, PA
-
$20M Architect of Record, New Construction, Multiuse Building
Affiliated Computer Systems, Robinson Township, PA
-
$7M Architect of Record Four-Story Computer Center, Offices & Parking
Development Dimensions International (DDI) Headquarters, Bridgeville, PA
-
$10M Architect of Record-New Construction, Four-Story Headquarters for Management Consulting Company, Learning Center, Offices and Parking
Mechanical and/or Electrical Equipment Upgrades/Replacements
• Washington Readiness Center – Washington, PA
• Wilkes-Barre Readiness Center – Wilkes-Barre, PA
• Plymouth Readiness Center – Plymouth, PA
• Lehighton Readiness Center – Leighton, PA
• Pine Grove Readiness Center – Pine Grove, PA
• Hunt Armory – Pittsburgh, PA
• Friedens Readiness Center – Friedens, PA
• Everett Readiness Center – Everett, PA